Once the load is too large or foreign matters enter the crushing chamber, the equipment may be damaged. At this time, it is necessary to check and replace the damaged parts in time. Aggregate crusher needs no-load start before formal operation, and then starts feeding after the equipment fully works normally and reaches the rated power and revolution, so as to ensure the stability of feeding and discharging system.
There are many matters needing attention during operation. Here, it is hoped that all operators should pay great attention to some common matters and operate the equipment in strict accordance with the production requirements.
At the same time, attention should be paid to prohibit some inoperable behaviors, conduct comprehensive inspection and maintenance of aggregate crush regularly, and eliminate faults in time to ensure the normal operation of the equipment and ensure the maximum production benefits of the enterprise.