Transformer Electric Heating Hot Air Curing Oven Application锛?/strong> Transformer Electric Heating Hot Air Curing Oven is mainly used for drying and curing large Transformer, Motor Stator Coils and other power equipment, the curing ovens heating speed is fast, energy saving and efficient.Flat car can be designed according to the user's workpiece load, safe and reliable. Technical parameters: Product nameHot Air OvenModel3000脳2000脳2080 Working temperature scopeRoom+10~300鈩?/p>Working room size3000脳2000脳2080mm( DxWxH) Note: The height from the flat car surface to the inner top is 1700mm Heating power36KWTemperature control precision卤1鈩?/p> Heating componentstainless steel electric heating tubeUniform temperature卤2鈩冿紙no-load锛?/p> Motor power1100W * 6setsInner deviceStainless steel flat car with light rail wheels, 1 set, loading capacity up to 5000 kgs Structure1.The hot air ovens adopt both sides air duct out of the wind, horizontal cyclic heating. Heating elements are installed in the air ducts of both sides of the oven, motors are installed on the top of the oven, door buckles are fixed by buckle handle. 2.Internal oven with 2 groove channel, .It is very easy to push in or out the trolley. MaterialInterior material is adopted SUS304 stainless steel plate, Exterior material is made of A3 cold-pressed carbon steel plate with fine powder coating treatment. Thermal insulation material1. Thermal insulation layer of door: high temperature resistant silicone strips forced tight (If the temperature over 220 鈩? It should be adopted the aluminum silicate strips) 2.Between the inner and outer walls of the equipment are filled with high-temperature resistant aluminum silicate, which is used for heat insulation and heat preservation.thickness 100mm. Products show:
High temperature resistant extension shaft motor and centrifugal blades:
Shipment and Delivery锛?/strong> Our company has professional forklift workers responsible for the shipment of goods to ensure the safety of the goods. QUALITY CONTROL锛?/strong> We have quality inspectors on the production line.All products must be inspected before delivery. 1.All the raw materials were inspected as soon as they arrived at our factory. 2. Check all purchased parts and brands and all details during the production process. 3. Check all welding and installation details during the production process. 4. The quality and packaging of all products shall be subject to final inspection upon completion FAQ: 1. When can I get the quotation? We usually quote within 24 hours after we get your inquiry and understand all your requirements. If you are very urgent to get the price, please tell us so that we will regard your inquiry priority. 2.Can you do the design for us? Yes. We have a professional team having rich experience in design and manufacturing. 3.What about the lead time for production? 25 working days for mass production.It depends on your quantity,and we will try our best to meet your needs. 4.What is your terms of delivery? EXW, FOB,CFR, CIF, etc. We warmly look forward to your consultation. It's my pleasure to serve you. Thanks for your attention!Customized Industrial Drying Oven website:http://www.zhihongdamachinery.com/industrial-drying-oven/ |