Rapid Deployment Solutions
RDS is a modern evolution of tradtional reinforced concrete foundation, eliminating phased of work such as :excavation,formwork,reinforcement,pouring concrete and embankment,construction time is reduced to 1-2days.
Debao has designed and manufactured a temporary or permanent rapid deployment tower that can be installed in 1 day with or without the use of a revolutionary anchoring system.
https://www.db-steel-tower.com/wireless-towers/portable-tower-systems/rapid-deployment-solutions.html